Quick answer: A 20 m² floor screed 50 mm thick needs 1 m³ of screed, i.e. 2100 kg of dry mix with a 5% reserve – 84 bags of 25 kg.
Cement or anhydrite floor screed for several rooms: volume, bags, mix recipe, insulation, PE sheet and edge strip
How the calculation works
For each room enter the length and width (or area and perimeter) and a constant thickness or a linear fall. The calculator works out the volume as area × average thickness, adds the reserve and, from the data of the selected system, gives the dry-mix bags, the ready-mix order in m³ or the ingredients of a traditional screed from your recipe. It also counts insulation boards, PE sheet with overlaps, edge strip along the perimeter and additives, and separates needed, reserve, purchase and leftover.
Inputs and units
- Rooms: length × width (m) or area (m²) and perimeter (m); thickness in mm, constant or with a linear fall.
- System: traditional screed (recipe and yield of one mix), dry mix in bags (consumption in kg/m² per mm or L per bag, 25 kg bag), flowing cement or anhydrite screed.
- Underfloor heating: pipe outer diameter and cover above the pipes from the system data.
- Layers: insulation boards (size, thickness, layers, waste), PE sheet (roll width and length, overlap), edge strip (roll length, height).
- Reserve (%), density for the mass estimate and additives (dose per m³, per bag or % of cement mass).
Formula and assumptions
Volume (m³) = area (m²) × average thickness (mm) ÷ 1000; with a linear fall the average thickness = (minimum + maximum) ÷ 2. Dry mix (kg) = volume in litres × consumption (kg/m² per mm), bags = kg ÷ bag size, rounded up. Traditional screed: number of mixes = volume ÷ yield of one mix, and cement, sand and water = number of mixes × recipe. PE sheet = area × roll width ÷ (roll width − overlap) + perimeter × turn-up. Edge strip = room perimeter. Mass = volume × density.
Worked example
Room 5 × 4 m = 20 m², floating screed 50 mm, dry mix 2.0 kg/m² per mm: volume 20 × 50 ÷ 1000 = 1 m³, with a 5% reserve 1.05 m³. Dry mix 2000 kg + 100 kg reserve = 2100 kg = 84 bags of 25 kg. Insulation 1 × 0.5 m: 40 boards + 5% waste = 42 boards. PE sheet with a 2 m roll and 10 cm overlap: 21.05 m² (1 roll of 2 × 25 m). Edge strip: perimeter 18 m (1 roll of 25 m).
More worked examples
- Linear fall from 40 to 60 mm in a 4 × 3 m room: average thickness (40 + 60) ÷ 2 = 50 mm, volume 12 × 0.05 = 0.6 m³, fall 20 mm over 4 m = 5 mm/m.
- Traditional screed with a recipe of 25 kg cement + 125 kg sand + 12 L water and a measured yield of 80 L: 1 m³ needs 12.5 mixes, 312.5 kg of cement (13 bags of 25 kg), 1562.5 kg of sand and 150 L of water.
- Underfloor heating with a 16 mm pipe and 45 mm cover: thickness 61 mm, volume 1.22 m³ for 20 m².
Dry mix by thickness (20 m², 2.0 kg/m² per mm, no reserve)
| Thickness (mm) | Volume (m³) | Dry mix (kg) | Bags of 25 kg |
|---|---|---|---|
| 35 | 0.7 | 1400 | 56 |
| 40 | 0.8 | 1600 | 64 |
| 50 | 1 | 2000 | 80 |
| 60 | 1.2 | 2400 | 96 |
| 70 | 1.4 | 2800 | 112 |
| 80 | 1.6 | 3200 | 128 |
What affects real consumption
- Flatness of the base slab: hollows and bumps increase the real volume.
- System data: consumption, yield and density differ between products.
- For traditional screed the yield of a mix depends on the sand, water and compaction.
- Losses during mixing, pumping and transport.
Common mistakes
- Adding up the loose volumes of cement and sand instead of working from the recipe and yield.
- Calculating a fall with the maximum thickness instead of the average.
- Sheet laid without overlaps and an edge strip lower than the layers along the wall.
- Deciding when to lay the floor covering from thickness alone, without measuring moisture.
Limits of the calculation
- An estimate of quantities, not a floor construction design.
- Minimum thickness and cover are checked only against the values you enter.
- Drying time and readiness for floor coverings are not calculated.
- The volume of heating pipes and an uneven base are not taken into account.
- No prices and no product names.
Frequently asked questions
How many bags of screed do I need for 20 m²?
At 50 mm and a consumption of 2.0 kg/m² per mm you need 2000 kg of dry mix, 2100 kg with a 5% reserve, i.e. 84 bags of 25 kg.
How do I calculate cubic metres of screed?
Area × thickness in metres: 20 m² × 0.05 m = 1 m³. With a fall use the average thickness, and add the reserve at the end (5% gives 1.05 m³).
How do I calculate screed laid to a fall?
For a uniform fall the average thickness is (minimum + maximum) ÷ 2: from 40 to 60 mm that is 50 mm, so a 4 × 3 m room needs 0.6 m³ and the fall is 5 mm/m.
How much cement and sand does a screed need?
Only from the recipe and the yield of a mix: with 25 kg cement, 125 kg sand, 12 L water and 80 L of finished screed per mix, 1 m³ needs 12.5 mixes, 312.5 kg of cement (13 bags), 1562.5 kg of sand and 150 L of water.
How thick is screed over underfloor heating?
Thickness in the pipe zone = pipe outer diameter + cover from the system data; with a 16 mm pipe and 45 mm cover that is 61 mm, and 1.22 m³ for 20 m².
Does the calculator tell me when tiles can go on the screed?
No. Readiness for floor coverings cannot be reliably derived from thickness; it depends on the screed type, temperature and humidity and is checked by measuring moisture as the manufacturer instructs.
Related calculators
Publisher: Art-Visum d.o.o. · Content reviewed:
Calculations use common consumption rates and manufacturers' technical data sheets; results are estimates. Methodology · Standards · About