Guides to pouring concrete and reinforcement

Concrete and reinforcement carry the whole structure, so a mistake in quantity or preparation becomes expensive later. This category contains guides on how much concrete you need for a slab, strip footing, column or fence post footings, how calculating the volume of concrete works with a reserve, and how much cement goes into a cubic metre when you mix it yourself. Tips show when bagged dry concrete is more practical and how far it goes on small jobs.

For reinforcement the page explains the number of bars and mesh sheets, laps, concrete cover and steel weight for slabs, beams and columns, together with a bending schedule. The work steps describe measuring, formwork, placing rebar on spacers, pouring and curing. You will also find the most common site mistakes: ordering without a reserve, adding water on site, rebar without spacers and concrete that is not cured during the first days. The concrete and rebar calculators give cubic metres, bags of cement, sand, gravel, water, kilograms and metres of steel, and every result can be saved to a project or downloaded as a PDF.

Open the calculator: Concrete

Other calculators in this category: Rebar

Guides

  • Concrete quantity guide: cubic metres, allowance, cement, aggregate and water – Short answer: concrete volume = length × width × thickness in metres, summed for all elements and increased by an allowance. A 5 × 4 m slab 12 cm thick is 2.4 m³, and with a 5 % allowance 2.52 m³. Here are the formulas for slabs, footings and columns, the allowance, order rounding, weight and typical ingredients for hand mixing, with examples calculated by the concrete calculator.

Tips

Step by step: Concrete

  1. Measure the element and calculate the concrete volume with a reserve.
  2. Set up and prop the formwork and seal the joints.
  3. Place the rebar on spacers and check the cover.
  4. Order concrete of the right class and consistency – no added water.
  5. Place it in layers, vibrate and level the surface.
  6. Cure the concrete by wetting or sheeting and do not load it too early.

Quick tips for your calculation

  • When calculating concrete volume, add a reserve for an uneven base and bulging formwork – running out mid-pour leaves a weak joint. Learn more
  • Cure fresh concrete by wetting it or covering it with sheeting for at least the first few days, especially in heat and wind. Learn more
  • Concrete drying time is only an estimate: before laying parquet, vinyl or linoleum, measure the moisture in the slab and compare it with the covering manufacturer's limit. Learn more
  • Post footings must reach frost depth or frost will lift them; fill the bottom of the hole with gravel, not soil, and check the local frost depth.
  • Coat the formwork with release agent before fixing the rebar and clean the panels after every pour – that way they last for more uses.
  • Rebar needs concrete cover: use proper spacers, not pieces of brick or stone.
  • Allow for laps where bars and mesh sheets are joined; without them the rebar estimate comes out too small.

Common mistakes

All common building mistakes

How to use the calculator

  • 1. Enter the element's dimensions (length, width, height/thickness)
    2. Select the concrete class
    3. The calculator gives the volume in m³

    For mixing your own concrete it calculates:
    • Amount of cement (bags)
    • Sand (m³)
    • Gravel (m³)
    • Water (litres)
  • 1. Enter the cross-section dimensions
    2. Enter the number and diameter of longitudinal bars
    3. Enter the diameter and spacing of stirrups/ties

    The calculator visually shows the reinforcement layout and calculates the total weight.