Guides to waterproofing bathrooms, foundations and roofs
Waterproofing is invisible, yet it decides whether a bathroom, balcony or basement stays dry for years. This category contains work steps and tips for polymer-cement and liquid membranes as well as bitumen coatings and torch-on membranes. It explains how many coats to apply and why the layer thickness is calculated with an allowance, where sealing tape, corners and pipe collars go, and how long to wait before tiling or backfilling a foundation.
The step-by-step section covers cleaning and priming the base, sealing the joints, applying two coats and letting them dry. The list of common mistakes warns about corners without tape, a single coat that is too thick, waterproofing only inside the shower and tiles laid on a coating that is not dry enough. The instructions show how to choose the application, the system and the water exposure class in the calculator, and how bitumen membrane rolls are calculated with overlaps. The waterproofing calculator then gives the amount of material, packs, metres of tape, the number of corners and collars, and drying times for a bathroom, foundation, roof or manhole, ready to save or download as a PDF.
Open the calculator: Waterproofing
Other calculators in this category: Sealants & crack repair
Step by step: Waterproofing
- Clean the substrate; it must be sound and dust-free.
- Apply primer as the product instructions say.
- Reinforce corners, joints and pipe penetrations with tape and collars.
- Apply the first coat of waterproofing with a brush or roller.
- When dry, apply the second coat crosswise to the first.
- Let the waterproofing dry completely before tiling.
Step by step: Sealants & crack repair
- Remove old sealant, dust and grease; the joint sides must be dry and sound.
- Measure the joint width and depth and pick a sealant for the use and joint movement.
- Press in the backer rod to the right depth without puncturing or stretching it.
- Apply masking tape along the edges and prime the joint sides if required.
- Gun the sealant evenly without bubbles and tool it smooth.
- Pull the tape straight after tooling and protect the joint from water and loads until it cures.
Quick tips for your calculation
- Make a movement joint roughly twice as wide as it is deep; set the depth with a backer rod so the sealant bonds only to the sides, not the bottom.
- Never fill expansion joints in floors and facades with rigid mortar: cover them with a flexible sealant or a profile and keep their layout through every layer.
- Reinforce corners, wall-floor joints and pipe penetrations with tape and collars before applying waterproofing.
- Apply liquid waterproofing in at least two coats and let each coat dry as the product instructions say.
Common mistakes
- Corners without sealing tape – Reinforce corners, joints and penetrations with tape and collars.
- Waterproofing in one coat – Apply at least two coats at the coverage given in the instructions.
- Waterproofing only the shower – Protect the whole floor and the walls around the shower, with an upstand at the walls.
- Tiling over wet waterproofing – Wait for the drying time in the instructions before tiling.
- Sealant bonded on three sides – Press in a closed-cell backer rod or bond-breaker tape and keep the width : depth ratio around 2 : 1.
- Crack filled with rigid mortar – Find the cause, open and fill the crack, embed mesh tape, and for live cracks and expansion joints use a flexible system or ask a professional.
How to use the calculator
- 1. Choose the application (e.g. bathroom, foundations, roof, shaft)
2. Choose the system type and the water exposure class
3. Enter the dimensions; for a bathroom the shower zone, door and corners
4. Check the thickness, coats, thickness allowance and reserve
5. Calculate – you get material, packs, tapes, collars and drying times - The area is multiplied by the number of layers and the reserve, then divided by the useful area of a roll. A 1 × 10 m roll with 10 cm side laps and 15 cm end laps covers 0.9 × 9.85 = 8.865 m². Roofs usually get two layers with staggered joints. Torch-welding needs a burner and gas – work with fire precautions.