Pavers and yard paving

Quick answer: A 5 × 4 m patio with 200 × 100 × 60 mm pavers in running bond needs 994 pavers (912 whole, 82 cut), with 3 % breakage 1,024, a 24 cm deep dig and about 7.7 t of sub-base.

Driveways, paths and patios: pavers, layers, kerbs and a 2D layout

How the calculation works

Enter one or more areas (rectangles or polygons, with excluded spots such as manholes or trees), the paver size, the pattern and the joint. Each area is laid out like in the 2D tile planner, so whole and cut pavers are counted, not guessed. From the layer thicknesses the calculator gives the dig and haul-away, sub-base, bedding, joint sand, geotextile, kerbs and their concrete, and rounds the purchase up to whole pallets.

Inputs and units

  • Areas: length and width or polygon corners (m), excluded areas with position and size
  • Paver: length, width and thickness (mm) or pieces per m² for other shapes; joint (mm)
  • Pattern and start: stack, running bond, 45° diagonal, herringbone 90° and 45°, basket weave; start at a corner or the centre, direction and offset
  • Layers after compaction (cm): sub-base and bedding; sub-base extension beyond the edge; level above the ground
  • Kerbs: piece size, edges with kerbs, concrete bed and haunch
  • Breakage and cut reserve (%), m² or pieces per pallet, soil type and truck

Formula and assumptions

Pieces = whole + cut pavers from the layout (every cut uses one paver); where no layout is calculated: area × 1 / ((a + j)(b + j)) plus an estimated cut reserve. Purchase = (pieces + breakage %) rounded up to whole pallets. Dig = sub-base area × (paver + bedding + sub-base − level above ground); loose = bank volume × swell factor. Loose sub-base = compacted ÷ compaction factor. Joint sand = area × (1 − ab / ((a + j)(b + j))) × paver thickness × density. Kerbs = length ÷ (piece + joint), rounded up.

Worked example

Patio 5 × 4 m, pavers 200 × 100 × 60 mm, 3 mm joint, running bond from a corner: 994 pavers (912 whole, 82 cut), with 3 % breakage 1,024. Sub-base 15 cm, bedding 3 cm, 30 cm extension: dig 24 cm over 25.76 m² = 6.18 m³ (8.66 m³ of loose topsoil, one truck load), sub-base 3.86 m³ compacted = 4.83 m³ loose ≈ 7.73 t, bedding 0.71 m³ loose ≈ 1.06 t, joint sand 78 kg (+20 % = 4 bags of 25 kg), 18 m of kerbs = 19 pieces and 0.71 m³ of kerb concrete.

More worked examples

  • Car driveway 6 × 3 m, 200 × 100 × 80 mm pavers in herringbone 90°, sub-base 30 cm, bedding 4 cm: 907 pavers (820 whole, 87 cut) + 28 breakage = 935; with 10 m² per pallet 2 pallets = 1,000 pavers, 93 left over. Dig 42 cm = 9.98 m³ (2 truck loads), sub-base 7.13 m³ compacted ≈ 14.3 t.
  • Pavers of another shape with 36 pieces per m² on 20 m²: 720 pieces, estimated cut reserve 5 % = 36, breakage 3 % = 23, purchase 779 pieces.

Starting layer thicknesses (not a load-bearing check)

UsePaverBeddingSub-base
Paths and patios60 mm3 cm15 cm
Car driveways80 mm4 cm30 cm

What affects real consumption

  • Soil bearing capacity, frost depth and drainage decide the real sub-base thickness.
  • Pattern and shape: herringbone at 45° and slanted edges need far more cuts than stack bond.
  • Pallet size and pieces per m² differ between products – enter the supplier's data.
  • How well the sub-base is compacted changes how much loose material you need.

Common mistakes

  • Ordering sub-base by the compacted volume – loose material is about 20–25 % more.
  • Forgetting the sub-base extension beyond the edge and the kerb bed.
  • Thin pavers and a thin sub-base on a driveway.
  • Laying without a fall – water should run off at about 1.5–2.5 %.

Limits of the calculation

  • Presets for pedestrian and vehicle use are starting assumptions, not a load-bearing check.
  • Each area is calculated separately; adjoining areas are best entered as one polygon.
  • Kerb corners, curves and steps are not modelled; kerb length is the length of the selected edges.
  • Multi-size patterns (several formats mixed) are not supported – use one paver size.
  • No prices; the fall and drainage of the surface are not calculated.

Frequently asked questions

How many pavers do I need per m²?

With 200 × 100 mm pavers and a 3 mm joint it is 1 / (0.203 × 0.103) ≈ 47.8 pieces per m² laid; without joints 50. Cuts at the edges add more – the calculator counts them from the layout.

How deep do I dig for pavers?

Paver + bedding + sub-base: for a path 6 + 3 + 15 = 24 cm, for a car driveway about 8 + 4 + 30 = 42 cm. Soil and frost can require more – the presets are only starting assumptions.

How much gravel do I need for a driveway sub-base?

Area including the extension beyond the edge × compacted thickness ÷ compaction factor: 23.76 m² × 0.30 m = 7.13 m³ compacted, ÷ 0.8 = 8.91 m³ loose ≈ 14.3 t.

How much sand do I need for paver joints?

Joint volume = area × joint share × paver thickness. For 20 m² of 200 × 100 × 60 mm pavers with 3 mm joints: 0.052 m³ ≈ 78 kg of dry sand, plus about 20 % for topping up after compaction.

Which paver pattern is best for a driveway?

Herringbone (90° or 45°) interlocks best under turning wheels; running bond across the driving direction is also common. Herringbone at 45° has the most cuts.

How many kerbs do I need?

Edge length ÷ (kerb length + joint), rounded up, plus a reserve: 18 m with 1 m kerbs and 3 mm joints = 18 pieces, with 5 % reserve 19. A 30 × 10 cm concrete bed with a 10 × 15 cm haunch takes 0.0375 m³ per metre.

Related calculators

Publisher: Art-Visum d.o.o. · Content reviewed:
Calculations use common consumption rates and manufacturers' technical data sheets; results are estimates. Methodology · Standards · About