Pool Calculator

Quick answer: An 8 × 4 m pool with 1.5 m of water holds 48 m³ (48,000 L); the excavation with working space and slope is about 158 m³, and the pump needs about 8 m³/h with a Ø 600 mm sand filter.

Volume, excavation, construction, water, chemicals and pump for a concrete, panel, one-piece or above-ground pool

How the calculation works

Choose the pool type (concrete, panel, one-piece fibreglass or above-ground), the shape and the parts you need. From the dimensions and water depth the calculator works out volume, floor and wall area and, for the selected parts, excavation and haul-away, concrete, blocks, rebar, waterproofing and lining, water top-up, chemicals per week, month and season, plus the pump, sand filter and indicative heating.

Formula and assumptions

Volume = water surface area × average depth (for a sloped floor (shallow + deep) ÷ 2). Excavation = ∫ footprint offset by the wall, working space and slope over the depth (water depth + freeboard + slab + sub-base). Haul-away = (excavation − backfill) × bulking factor 1.25. Evaporation = area × 3–7 mm per day. Pump flow = volume ÷ turnover time (4–6 h); filter area = flow ÷ filtration rate (30–50 m/h).

Worked example

Concrete pool 8 × 4 m with 1.5 m of water: volume 48 m³ (48000 L), water surface 32 m², floor and walls 71.6 m². The 2 m deep excavation with 0.8 m working space and a 0.5 : 1 slope is 158.29 m³; after 80.86 m³ of backfill, 77.42 m³ in place, i.e. 96.78 m³ of loose soil, is hauled away – 10 trucks of 10 m³. Pump 8 m³/h, sand filter Ø 600 mm, evaporation 160 L per day.

More worked examples

  • Round above-ground pool 4.5 m in diameter with 1.1 m of water: volume 17.49 m³, filling with an 18 L/min hose takes 16.2 h; pump 2.92 m³/h and a Ø 400 mm filter.
  • The same 8 × 4 × 1.5 m concrete pool with salt water: 192 kg of salt for the first fill (8 bags of 25 kg), and with a cover evaporation drops from 5 to 1.5 mm per day.

Default values and usual ranges in practice

QuantityDefaultRange in practice
Working space in the excavation0.8 m (concrete), 0.5 m (one-piece, panel)0.5–1.0 m
Soil bulking factor1.251.1–1.4
Summer evaporation5 mm per day3–7 mm per day
Turnover time6 h4–6 h
Filtration rate40 m/h30–50 m/h
Maintenance chlorine1 g/m³ per day0.5–2 g/m³
Salt (electrolysis)4 kg/m³3–5 kg/m³

What affects real consumption

  • The actual water depth and floor slope – volume grows linearly with depth.
  • Soil type: the excavation slope and bulking factor change the volume and number of trucks.
  • Sun, wind, temperature and a cover determine evaporation and chlorine use.
  • The number of swimmers and how often the filter is backwashed change top-up and chemicals.

Common mistakes

  • Calculating volume with the wall height instead of the water depth.
  • Excavation without working space and slope – the real excavation can be twice the pool volume.
  • Haul-away calculated in place: a truck carries loose soil, about 25 % more.
  • Dosing chemicals by guesswork instead of by water tests and the instructions on the pack.

Frequently asked questions

How do I calculate pool volume?

Water surface area times average water depth. For an 8 × 4 m pool 1.5 m deep that is 32 × 1.5 = 48 m³ or 48,000 litres; for a sloped floor use the average of the shallow and deep end.

How much soil is dug out for an 8 × 4 m pool?

With a 25 cm concrete wall, 0.8 m working space, slab, sub-base and a 0.5 : 1 slope, the excavation is about 2 m deep and holds about 158 m³ of soil in place – more than three times the water volume.

How long does it take to fill a pool with a garden hose?

Volume in litres divided by the hose flow rate. At 18 L/min a 48 m³ pool takes about 44 hours to fill, which is why a water tanker is often ordered for larger pools.

What size pump and filter does a pool need?

The pump should pass the whole volume through the filter in 4–6 hours: for 48 m³ and 6 h that is 8 m³/h. At a filtration rate of 40 m/h this needs 0.2 m² of filter, i.e. a 600 mm sand filter.

How much salt does a salt-water pool need?

Usually 3–5 kg per m³ for the first fill; at 4 kg/m³ a 48 m³ pool needs 192 kg of salt. Salt does not evaporate – it is topped up only for water lost through splash-out and backwashing.

What does the pool construction quantity estimate include?

Quantities in 14 categories: excavation and removal, sub-base and drainage, XPS, concrete, rebar and formwork, waterproofing, plant room, pipework, filtration, electrics, finish, steps and equipment, landscaping, and filling and support. Each item can be excluded or corrected manually; product-dependent values come from the data sheet.

Related calculators

Tips

Publisher: Art-Visum d.o.o. · Content reviewed:
Calculations use common consumption rates and manufacturers' technical data sheets; results are estimates. Methodology · Standards · About