How many pool chemicals per month: chlorine, pH and shock
Short answer: an 8 × 4 m pool with 1.5 m of water (48 m³), sanitised with chlorine tablets (1 g/m³ a day), shocked once a week (10 g/m³) and corrected weekly with pH minus, uses about 1.46 kg of tablets, 2.08 kg of shock and 2.08 kg of pH minus a month, plus 1.04 L each of flocculant and algaecide. For a 4-month season you buy 6 kg of tablets (1 × 5 kg + 1 × 1 kg), 9 kg of shock and 9 kg of pH minus. Always dose according to the instructions on the pack – these are planning estimates.
Published:
Target water values
In a private pool pH is kept between 7.2 and 7.6 and free chlorine between 1 and 3 mg/L. At a higher pH chlorine works less well, so more is used. Test the water at least once a week, more often in summer, and only then dose.
Quantities for a 48 m³ pool
| Product | Per week | Per month | Season (4 mo.) | Packs |
|---|---|---|---|---|
| Chlorine tablets (200 g) | 0.34 kg (2 tablets) | 1.46 kg | 5.84 kg | 1 × 5 kg + 1 × 1 kg |
| Shock chlorine | 0.48 kg | 2.08 kg | 8.34 kg | 1 × 5 kg + 4 × 1 kg |
| pH minus | 0.48 kg | 2.08 kg | 8.34 kg | 1 × 5 kg + 4 × 1 kg |
| Flocculant | 0.24 L | 1.04 L | 4.17 L | 1 × 5 L |
| Algaecide | 0.24 L | 1.04 L | 4.17 L | 1 × 5 L |
How it is calculated
- Maintenance chlorine: volume × daily dose × 7 days; 48 m³ × 1 g/m³ × 7 = 336 g a week.
- Shock: volume × dose per treatment ÷ weeks between treatments; 48 × 10 g ÷ 1 = 480 g a week.
- pH minus: roughly 10 g/m³ to change pH by 0.1; for a weekly correction of 0.1 that is 480 g.
- Per month = per week ÷ 7 × 30.4 days; for the season multiply by the number of months and round to whole packs with the least surplus.
Salt water instead of tablets
With electrolysis the cell makes chlorine from salt. For the first fill 4 kg of salt per m³ is usual, so a 48 m³ pool needs 192 kg (8 bags of 25 kg). Salt does not evaporate: it is topped up only for water lost through splash-out and backwashing – about 14.71 kg a month in this example. Shock and pH correction are still used as needed.
Common mistakes
- Dosing by the calendar without testing pH and chlorine.
- Shocking in daytime sun, when much of the chlorine breaks down quickly.
- Throwing tablets straight into the pool instead of a floating dispenser or the skimmer.
- Mixing different chemicals in the same container – dose each one separately and according to the instructions on the pack.
Sources and assumptions
The doses are values common in practice for private pools (chlorine 0.5–2 g/m³ a day, shock 10–20 g/m³, salt 3–5 kg/m³), not data for a specific product. Use rises with water temperature, sun and the number of swimmers. Always dose according to the instructions on the pack.
Frequently asked questions
How many chlorine tablets a week does a 48 m³ pool need?
At 1 g/m³ a day that is 336 g a week, i.e. 2 tablets of 200 g; in hot summer weather with more swimmers use goes up.
How often should a pool be shocked?
In season usually once a week in the evening, and after many swimmers, a storm or when the water turns cloudy – always according to the instructions on the pack.
Why should pH be between 7.2 and 7.6?
In this range chlorine works best and the water does not irritate the eyes or damage the equipment. Above pH 7.6 chlorine is weaker and more is used.
Calculate yours: Pool Calculator