Guides to the garden: paving, decking, fences, excavation and pools
Landscaping a garden usually starts with excavation and ends with paving, a deck, a fence or a pool. This category contains guides and tips for all of these jobs. The guide on fence posts explains how the number of posts, panels or mesh rolls follows from the length and spacing, and how much concrete the post footings need. For excavation the page describes the difference between in-situ, loose and compacted soil and how the number of lorry loads for removal is calculated.
The paving calculator works out full and cut pavers, sub-base, bedding layer, jointing sand and kerbs, while the decking calculator counts boards, joists, supports and fixings for timber or composite decks. For pools there are tips on evaporation and topping up water and on monthly chemical use, plus the calculation of the pool excavation. The steps in each calculator, short tips and common mistakes, such as paving without a load-bearing base or weak corner posts, help you get the job right the first time. Choose a calculator to get a shopping list for the whole garden, ready to save to a project.
Open the calculator: Pavers and yard paving
Other calculators in this category: Decking calculator · Fence calculator · Excavation and fill · Pool Calculator
Guides
- How many fence posts do I need? Posts, bays, mesh, panels and concrete – Short answer: number of bays = fence length ÷ maximum post spacing, rounded up, and a straight open run has one more post than bays. For 30 m of fence with posts at most 2.5 m apart that is 30 ÷ 2.5 = 12 bays and 13 posts. Corners, gates, panels and sloping ground change the number and type of posts – here is how, with illustrative examples calculated by the fence calculator.
Tips
- How many pool chemicals per month: chlorine, pH and shock – Chlorine tablets, shock, pH minus, flocculant and algaecide for a 48 m³ pool per week, month and season – and how much salt for a salt pool.
- How much water a pool loses to evaporation and how much to top up – An 8 × 4 m pool loses 96–224 L of water a day in summer; with splash-out and backwash that is about 8.5 m³ a month. How much a cover helps.
Quick tips for your calculation
- Leave a gap of a few millimetres between decking boards for water and wood movement, and never lay the subframe directly on soil.
- Paving strength depends on the sub-base, not the block thickness: compact the base in layers and build in a fall for drainage.
- Excavated soil takes up more space than in the ground: plan haulage and lorries by the loose (bulked) volume. Learn more
- Secure the sides of deeper excavations with a slope or shoring and never stay in an unsupported trench.
- Filling a pool for the first time takes long, and water is lost to evaporation and filter backwashing – plan for top-ups during the season.
- Corner, end and gate posts carry most of the fence load, so use stronger posts or diagonal braces there. Learn more
- Gabion stone must be larger than the mesh opening; hand-place the front face and fill the inside in layers with spacers so the basket does not bulge.
Common mistakes
- Paving without a sub-base – Build a sub-base of the right thickness, compacted in layers, with a fall.
- Spoil removal without bulking – Plan haulage by the loose (bulked) volume.
- One measurement per wall – Measure at two heights and check the diagonals.
- Decking laid on the ground – Raise the subframe on pads, with gaps and a fall for water.
- Cutting plan without saw kerf – Enter the tool's kerf width in the cutting plan.
- Weak fence corner posts – Use stronger posts and diagonal braces at corners and ends.
- No curing of concrete – Keep the concrete wet or covered with sheeting for at least the first few days.
- Waterproofing in one coat – Apply at least two coats at the coverage given in the instructions.
How to use the calculator
- 1. Choose pedestrian or vehicle use (starting layer thicknesses)
2. Enter the areas, excluded areas and edges with kerbs
3. Enter the paver size, pattern and joint
4. Check the layers, geotextile, kerbs and pallet size
5. In the 2D layout move the start point or change the direction
6. Save, download the PDF or continue to excavation, concrete or drainage - 1. Choose wood or WPC and the terrace shape (or draw the outline).
2. Enter board width, gaps and available board lengths.
3. Set joist and support spacing.
4. Check the 2D plan: whole and cut boards, joists and supports.
5. Add extras (steps, fascia, base) if needed and download the PDF. - Compare board lengths in the results table – the calculator gives the number of boards and the waste percentage for each. Laying parallel to the longer side usually means fewer cuts.
- 1. Choose mesh, panels or timber.
2. Enter the sections (or draw the route) with height and angle.
3. Add gates and passages.
4. Set post spacing, footings and accessories.
5. Check the plan and side view, then download the purchase list and PDF. - For mesh and timber the spacing is the maximum allowed distance between posts (usually from the manufacturer's instructions). For panels the panel width sets the spacing; the last field can be shortened.
- 1. Choose the shape and state whether the dimensions refer to the structure, bottom or top
2. Enter the depth, working space and side slope
3. Add soil layers with bulking, compaction, density and share suitable for backfill
4. Add embedded elements (footings, pipes)
5. Enter the truck volume and payload – the calculator gives the surplus, shortfall and number of trips - Switch on “Variable depth” and enter stations (horizontal distance), the depth and ground level at each. Between stations the depth changes linearly and the volume is calculated with Simpson's rule. The sloped bottom length is shown too.
- The excavation bottom is larger than the pool by the wall thickness and the working space (0.5–1.0 m). Its depth is the water depth + water level below the rim + slab + gravel sub-base. In loose soil the sides are sloped (e.g. 1 : 1), so the top is wider still. Haul-away is calculated as loose soil (× 1.25).
All guide categories · Frequently asked questions about the calculators